Reconsolidation of the entire decorated ceiling of Grand Hotel Intercontinental of Paris, comprising drilling of thousands of holes to insert rods and resins to consolidate the mass of suspended plaster to the wood and metal frame of the building....

Creation, fabrication and implementation of all cornices, capitals, columns, pediments and rosettes plasterworks on the entire palace....

On the total surface of the walls of the ground floor and on the staircase leading to the lounges, application of a stone imitation decorative coating including the application of Stucco, tracing and engraving of the joints, filling of the joints with a binder lighter...

The construction site of the Grand Palais corresponds to the continuation of a work not completed in 1900. The original plans preserved were scrupulously respected. Some pieces were drawn, proposed to the approval of the architect of the Historical Monuments, realized in workshop, before their...

Our challenge was to redo the stucco decor dating from 1906 identical by incorporating above the decorations, the passage of air, water, air conditioning, and the electrical network without altering the lines and curves of the original. Work in the areas of the ground floor...

Arrangement of the Musée d'Orsay in the old station and the former Hôtel d'Orsay. Realization of false ceilings with luminous grooves and staff cymas to support the stucco. Realization of cymas in roman stucco in the gallery of the heights with acoustic resonators and ferrules to hang...

Renovation of the main stairwell of a Crédit Lyonnais building The winners of the 6th Trophées Internationaux Saint-Gobain Gypsum Trophy "Plaster": The company S.O.E Stuc and Staff for the agency LCL Paris, France [blockquote text = "The company SOE Stuc and Staff, wins the international jury vote for...